Project Completed: May 2019 Site Location:Horsham, PA Client: Whitemarsh Cemetery Skills: Landscape Construction, Excavation, Grading, Project Management, Surveying Project Team: Holly Days Nursery
Project Description:
Along with the masonry for the memorial on this project, we were tasked to install the required drainage system for the development in the Whitemarsh Cemetery which was required by permit. The rain garden they call it, or retention based, which it ultimately ends up being, is very large and includes two overflows, an outflow for the drainage of the memorials and two cleanouts. The basin holds water for approx. 48 hours and slowly infiltrates through the engineered rain garden mix soil base. Following survey the edges of the basin are feathered into existing grade and meet elevation. The basin was straw matted, seeded and penn mulched following completion.